Menu
Home
Advanced Search
Directory of Libraries
Languages
فارسی
English
العربی
عنوان
Flow manufacturing :
پدید آورنده
by Richard J. Schonberger
موضوع
Case studies,Just-in-time systems, Case studies.,Just-in-time systems.,Lean manufacturing, Case studies.,Lean manufacturing.,Production control-- Evaluation.,Just-in-time systems,Lean manufacturing
رده
TS157
.
4
.
S39
2019
کتابخانه
Center and Library of Islamic Studies in European Languages
محل استقرار
استان:
Qom
ـ شهر:
Qom
تماس با کتابخانه :
32910706
-
025
INTERNATIONAL STANDARD BOOK NUMBER
(Number (ISBN
1138362298 (hardcover ; alkaline paper)
(Number (ISBN
9781138362291 (hardcover ; alkaline paper)
TITLE AND STATEMENT OF RESPONSIBILITY
Title Proper
Flow manufacturing :
General Material Designation
[Book]
Other Title Information
what went right, what went wrong : 101 mini-case studies that reveal lean's successes and failures /
First Statement of Responsibility
by Richard J. Schonberger
.PUBLICATION, DISTRIBUTION, ETC
Place of Publication, Distribution, etc.
New York, NY :
Name of Publisher, Distributor, etc.
Routledge/Productivity Press,
Date of Publication, Distribution, etc.
2019
PHYSICAL DESCRIPTION
Specific Material Designation and Extent of Item
xvii, 551 pages ;
Dimensions
25 cm
INTERNAL BIBLIOGRAPHIES/INDEXES NOTE
Text of Note
Includes bibliographical references and index.
TOPICAL NAME USED AS SUBJECT
Case studies
Just-in-time systems, Case studies.
Just-in-time systems.
Lean manufacturing, Case studies.
Lean manufacturing.
Production control-- Evaluation.
Just-in-time systems
Lean manufacturing
DEWEY DECIMAL CLASSIFICATION
Number
658
.
5
Edition
23
LIBRARY OF CONGRESS CLASSIFICATION
Class number
TS157
.
4
Book number
.
S39
2019
PERSONAL NAME - ALTERNATIVE RESPONSIBILITY
Schonberger, Richard
ORIGINATING SOURCE
Date of Transaction
20200822162240.0
ELECTRONIC LOCATION AND ACCESS
Electronic name
مطالعه متن کتاب
[Book]
Y
Proposal/Bug Report
×
Proposal/Bug Report
×
Warning!
Enter The Information Carefully
Error Report
Proposal